UST, AST Removal and Replacement - Paradise, Mt. Rainier, WA
Work under the contract consisted of conducting state-regulated remedial action and investigation at various locations as well as performing a facility upgrade. Specific features of work include the preparation of site specific work plans, demolishing an existing fueling systems, removing underground storage tanks, excavation and off-site thermal treatment of contaminated soils, and installing an above-ground fueling system for emergency generator. In addition various locations within the park required follow-up site investigation by means of well drilling sampling, analysis and report preparation.